Tuesday, 19 April 2011

Heat pump Case Study Thorpe Arnold Village Hall

Heat pump Case Study Thorpe Arnold Village Hall: "Installation of Thorpe Arnold Village Hall air conditioning heat-pumps :

Orion air conditioning & refrigeration ltd were asked to look into the installation of a new church air conditioning heat-pump heating system for the Thorpe Arnold  for Eco Heat pump Wise. Thorpe Arnold Village Hall is a 19th century Building with a with around 120 meters/Squared of area that no existing heating system installed."

No comments:

Post a Comment