Heat pump Case Study Thorpe Arnold Village Hall: "Installation of Thorpe Arnold Village Hall air conditioning heat-pumps :
Orion air conditioning & refrigeration ltd were asked to look into the installation of a new church air conditioning heat-pump heating system for the Thorpe Arnold for Eco Heat pump Wise. Thorpe Arnold Village Hall is a 19th century Building with a with around 120 meters/Squared of area that no existing heating system installed."
No comments:
Post a Comment