Fujitsu General Central Air-conditioner (Wuxi) Co., Ltd. (100% owned by FG, hereinafter “FGCA”) contracted the supply and installation of multi air conditioning system for buildings “AIRSTAGE®” (273 systems consisting of 273 outdoor units and 1,399 indoor units) to “Shandong Steel Group Headquarter Building” which was constructed in the third stage construction area of “Jinan High-Tech Industrial Development Zone”, Jinan City, Shandong, China. The installation work will start in October. In the same development zone, we have concluded the contract of order and supply of total about 1,200 systems for 3 years along with the first and second stages.
China is the world biggest market of air conditioners accounting for 37% of the world market with 26.74 million sets in the combined total of home use and commercial use in 2009. Among them, the market of multi air conditioners for buildings is rapidly expanding as the construction of buildings is progressing at high speed because of the development of urban area and the public capital investment measures in the scale of 4 trillion yuen (about 54 trillion yen) for 2 years were put forward by the Chinese government last year as economic stimulus measures.
Along with the improving quality of life supported by high economic growth, the demand for the comfort and energy-saving performance of air conditioners due to environmental issues and electricity shortage is increasingly heightening.
In the office building development work in Jinan City, Shandong which started in 2008, FGCA acquired order, in strong cooperation with the distributor, for the installation of air conditioning facility for buildings in the first stage construction in September, 2008 and delivered 348 systems in March this year and also received order for 594 systems in the second stage construction which started in September 2,009, delivery of which will be completed in December this year. Together with the order this time, total about 1,200 systems will be delivered for 3 years. This is as a result of the evaluation of the energy-saving performance, past sales record and high quality installation and after-sale service setup with quick follow-up of the multi air conditioning system for buildings “AIRSTAGE®” as well as the reliability acquired by the installation for the first stage construction.
The “AIRSTAGE®” we supplied this time can make adjustment of room temperature for the floors and rooms in the building individually and provide comfortable room environment. Also, by adopting the centralized control system, collective centralized control of all outdoor units and indoor units became available and the optimization of the air conditioning of the whole building and the reduction of the consumption of electricity have been realized.
FG group will aim to further expand business in the future by offering energy-saving and comfortable room environment in the market of multi air conditioning system for buildings in China.
1st stage construction area
No.8 Tower, Shuntai Square (Left)
2nd stage construction area
IT Industry R & D and Production Complex (Front)
Software R & D and Production Complex (Back)
3rd stage construction area (for which we acquired order this time)
Shandong Steel Group Headquarter Building
In a world where resources are running out it is time to use energy efficient equipment like heat pumps, wind chargers and solar panels to reduce CO2. We are UK specialists in high efficiency air conditioning heat-pumps sales, service and installation. Air Conditioning Heat Pumps have risen to the challenge. We sell all types of high efficiency equipment including brands Fujitsu, LG and Daikin. Our website: www.orionairsales.com
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment